Unit of Measurement & Rule of Measurement



Civil Engineering Measurement Units: item shall be fully described and shall include wherever necessary all material , transport, unloading, stacking, storing, waste handling, return of packing, necessary scaffolding, safety appliance, lighting at place of work, all labour required for finishing to its shape, size, setting, fitting and fixing in position, cutting, waste and all other incidental operation where necessary.In booking dimension the order shall be in following sequence of length , breath and height or depth or thickness.

All work shall be measure net subjected to following tolerance, unless otherwise stated.

a. Dimension shall be measured to nearest 0.01 m.
b. Area shall be worked out to the nearest 0.01 sq. m.
c. Cubic content shall be calculated to nearest 0.01 cu.m.
d. Weight shall be worked out to the nearest 0.001 tonne.
e. The thickness of RCC slab shall be measured to nearest 0.005 m.
f. The thickness of woodwork shall be measured to the nearest to 0.002m.
g. The thickness of steel work shall be measure to nearest 0.001m.
h. The length of steel reinforcement bar shall be measured to the nearest 0.005 m and its diameter to nearest 0.0001m.
i. If the thickness of road is less than 20m,m its thickness shall be measured to nearest 0.005m.
j. Area shall be measured to the nearest 0.01 sq. M., but the area of steel shall be measured to the nearest 0.0001 cu.m. ,
k. Volume shall be measured to the nearest 0.01 cu.m., but volume of wood shall be measured to nearest 0.001 cu.m.

Civil Engineering Measurement Units

Same type of work under different condition and nature shall be measured separately under separate item e.g.
• Work under water
• Work in liquid mud
• Work under tides
• Work in snow, etc.

In case of structural concrete, brickwork or stone masonry, the work under following categories shall be measured separately and the height shall be described.
• From foundation to plinth
• From plinth level to first floor level
• From first floor level to second floor level and so on,

The bill of quantities shall fully describe the material, proportion and workmanship and accurately represent the work to be executed.

A. Material:

Sr. No.Details of Material/ itemUnit of Measurement
1CementBag
2Sand, Aggregate, Brick batsCu. m.
3BricksNos.
4WhiteCementKg
5Slacked LimeQuintal
6WoodCu. m.
7Reinforcement steelKg
8G. I. SheetKg
9A.C.  SheetSq. m.
10 Steel Sections ( angles, channel, I- sections)Kg
11AdhesivesKg
12Turpentine, Primer, VarnishLitre
13Oil PaintLitre
14Water proof Ower, DistemperKg
15Kotah StoneSq. m.
16Mozai TilesSq. m.
17W. C. TubNo.
18Nanhi Trap, Gully TrapNo.
19GI Pipe, CI pipe, PVC Pipem
20Rolling shutterSq. m.
21Wire GrillSq. m.
22Plywood SheetSq. m.
23Wash BasinNo.


B. Earthwork

Sr. No.Details of Material/ itemUnit of Measurement
1Earthwork in an excavation in ordinary Soil in Hard Soil in Muroom in RockCu. m.
2Surfacing DressingSq. m.
3Filling in plinth and FoundationCu. m.
4Exaction for Pipe, cable, etc.m

C. Brick Masonry / Stone Masonry:

Sr. No.Details of Material/ itemUnit of Measurement
1Brickwork in foundation, plinth and superstructureCu. m.
2Brickwork in partition wallSq. m.
3Honeycomb brickworkSq. m.
4Stone masonry, Random rubble masonry, coursed masonryCu. m.


D. Concreting:

Sr. No.Details of Material/ itemUnit of Measurement
1Brick bat cement concrete (B. B. C.C.)Cu. m.
2P. C. C.Cu. m.
3R. C. C.Cu. m.
4Damp Proof Course(DPC)Sq. m
5Reinforcement SteelKg
6Centering and ShutteringSq. m

E. Wood Work

Sr. No.Details of Material/ itemUnit of Measurement
1Wood work for Door Window frameCu. m.
2Wood work for Door/ Window shuteersSq. m
3Wooden floorSq. m

F. Steel Work:

Sr. NoDetails of Material/ itemUnit of Measurement
1Steel Sections ( angles, channel, I- sections)Kg
2Steel Doors and WindowsSq. m
3Steel GateSq. m
4Steel Railingm
5Steel grillSq. m
6Steel, C.I. Pipesm

G. Roofing:

Sr. No.Details of Material/ itemUnit of Measurement
1Tiled RoofSq. m
2Country tile roof including bamboo jaffriSq. m
3G.I. Sheet roofSq. m
4Waterproofing of roofSq. m

H. Plastering, Pointing Finishing:

Sr. No.Details of Material/ itemUnit of Measurement
1Cement PlasterSq. m
2PointingSq. m
3Skirtingm
4DadoSq. m
5White washing,Sq. m
6Painting of Doors, WindowsSq. m
7Painting of LettersNo

I. Flooring:

Sr. No.Details of Material/ itemUnit of Measurement
1Tiles Flooring, Terazzo FlooringSq. m
2I.P.S. Flooring, Brick FlooringSq. m
3Kotah Stone flooring, Marble FlooringSq. m

J. Miscellaneous Item:

Sr. No.Details of Material/ itemUnit of Measurement
1Glazing WorkSq. m
2Plaster RepairingSq. m
3Brick/ Stone PitchingCu. m
4Fixting Frame to wallNo